Electric Power is vastly becoming the lifeblood of most businesses. No matter which industry; having power available and ready when you need, is crucial in today's economy. Whether you require emergency power or have a large event or project that is planned in advance, Florida Detroit Diesel - Allison Rental Division is ready when you are.
Our rental Power Generation models provide stand-by or back-up power when and where you need it. Connect a unit to a building; take one to a remote location: get the power you need for any purpose.
 |
Emergency Management |
 |
Construction Power |
 |
Regularly scheduled maintenance during planned shutdowns |
 |
Providing additional power to protect critical load operations |
Our generator sets are available in all ranges to suit your needs. All units are self-contained, trailer ready for easy delivery and designed for quick connection plus fast and convenient servicing. Florida Detroit Diesel - Allison is a brand leader in diesel power, and was awarded the honor of being the #1 distributor in the region by MTU.
All Florida Detroit Diesel - Allison products come with a service guarantee, our prime power generators are supporting some of Florida's most significant structures, including: American Airlines Sports Arena, Florida Department of Transportation Turnpike Enterprise and Miami International Airport Expansion.
Florida Detroit Diesel-Allison has significant power generation experience in a variety of industries and markets. Our products are currently in place, supporting some of Florida's most significant structures and systems, including: American Airlines Sports Arena; Florida Department of Transportation Turnpike Enterprise; Miami International Airport Expansion; WTVJ NBC 6; the University of Miami; and Ironbridge; a unique water reclamation plant installation for the city of Orlando.
As the authorized factory distributor for Detroit Diesel and MTU engines, FDDA has superior technical expertise and knowledge that allows us the opportunity to customize solutions for the most critical applications, including: hospitals; municipalities; airports; data centers and more.
kW @ 0.8 Power Factor
| |
|
Phase I |
Phase III |
| kW |
kVA |
240V |
208V |
240V |
480V |
| 20 |
25 |
83 |
70 |
60 |
30 |
| 25 |
31 |
104 |
87 |
76 |
38 |
| 30 |
37 |
125 |
104 |
90 |
45 |
| 40 |
50 |
168 |
139 |
120 |
60 |
| 50 |
62 |
208 |
173 |
152 |
76 |
| 60 |
75 |
250 |
208 |
181 |
91 |
| 75 |
94 |
312 |
261 |
226 |
113 |
| 100 |
125 |
416 |
347 |
301 |
150 |
| 125 |
156 |
520 |
433 |
375 |
188 |
| 150 |
187 |
625 |
520 |
450 |
225 |
| 180 |
225 |
735 |
625 |
450 |
271 |
| 200 |
250 |
833 |
694 |
501 |
301 |
| 250 |
312 |
- |
866 |
751 |
376 |
| 300 |
375 |
- |
1040 |
903 |
451 |
| 350 |
438 |
- |
1220 |
1053 |
527 |
| 400 |
500 |
- |
1390 |
1203 |
602 |
| 500 |
625 |
- |
1735 |
1504 |
752 |
| 600 |
750 |
- |
2080 |
1803 |
902 |
| 700 |
875 |
- |
2430 |
2104 |
1052 |
| 800 |
1000 |
- |
2780 |
2405 |
1203 |
| 900 |
1125 |
- |
3470 |
2709 |
1354 |
| 1000 |
1250 |
- |
4350 |
3009 |
1504 |
| 1250 |
1563 |
- |
5205 |
3765 |
1885 |
| 1500 |
1875 |
- |
- |
4520 |
2260 |
| 1750 |
2188 |
- |
- |
5280 |
2640 |
| 2000 |
2500 |
- |
- |
- |
3000 |
| Q: |
What size Power Generator do I need? |
| A: |
You will need to know your service's voltage and amperage rating. If you can contact your utility company and they can provide that information to you. Use the cross chart below to determine the kW/kVA rating appropriate for you. |
| Q: |
What duty cycle will I need? |
| A: |
You will need to know whether you need single shift (8 hours), double shift (16 hours), or triple shift (24 hours). |
| Q: |
Where will the Power Generator unit be placed? |
| A: |
Identify the location where your rental unit will be placed and determine how much cable length you will need from the generator to the main distribution. |